Schedule adherence
Schedule adherence is the percentage of visits that both arrived on time and finished by their scheduled end, out of the visits scheduled in a period that took place.
The inputs.
A visit adheres when it both arrives on time and finishes inside its scheduled slot.
- Arrived on timeArrival no later than the scheduled start plus your grace period, for example 15 minutes.
- Finished by the scheduled endThe visit was completed before the end of its scheduled slot.
- CohortVisits scheduled in the period that took place. Visits the customer cancelled or moved are left out; a visit your company moved after confirming it is measured against the original time.
- Worked example400 visits were scheduled in March and 12 were cancelled by customers, leaving 388. 341 arrived on time, and 318 of those finished by the scheduled end. Schedule adherence = 318 ÷ 388 = 82%. On-time arrival for the same visits is 341 ÷ 388 = 88%.
- Decision it informsWhether job durations and drive time are planned realistically, so the slots you give customers are slots you can keep.
- Read withOn-time arrival rate, which uses the same visits but checks arrival only.
What to know before you track it.
How to calculate schedule adherence
Schedule adherence equals visits that arrived on time and finished by the scheduled end, divided by visits that took place in the period. "On time" means arrival no later than the scheduled start plus a grace period you set once, such as 15 minutes. Leave out visits the customer cancelled or moved; measure a visit your company moved after confirming it against the original time. On-time arrival rate uses the same visits and checks arrival only, so it is always equal to or higher than schedule adherence.
Why schedule adherence matters for commercial contractors
Commercial customers plan building access, tenants and staff around your slot, so a visit that overruns can cost them as much as one that starts late. Schedule adherence shows whether the day you planned is the day that happened. It is a measure of your own dispatch plan; contractual response and resolution windows are measured separately as SLA compliance.
What to look at when it drops
Compare the gap between on-time arrival and schedule adherence. If arrivals are fine but visits overrun, job durations are under-estimated for that work type. If arrivals slip, look at drive-time buffers and the first job of the day running long. Both are planning questions to test against your own visits before changing headcount.
How Thermal tracks schedule adherence
Each visit in Thermal records its scheduled start and end and the times the technician went en route, arrived and completed. The operations dashboard's on-time arrival tile counts arrivals within 15 minutes of the scheduled start; Thermal does not yet show a single schedule adherence figure that also checks the finish time, so that version is worked out from the visit times.
Questions about this term.
How is schedule adherence different from on-time arrival rate?
On-time arrival checks only whether the technician arrived inside the grace period. Schedule adherence also requires the visit to finish by its scheduled end, so it is the stricter of the two.
How is schedule adherence different from SLA compliance?
Schedule adherence measures your own plan for the day. SLA compliance measures the response and resolution windows written into a customer's contract.
What if the customer reschedules?
Leave the visit out. If your company moves a visit after confirming it, measure it against the original time.
How do you improve schedule adherence without hiring more techs?
Start by checking which part fails: late arrivals point at drive-time buffers and sequencing; overruns point at job durations set too short for the work type.
These numbers, on your own book.
If you want to see them calculated from real work orders and agreements rather than a spreadsheet, that's a demo.