Dispatch efficiency

Dispatch efficiency describes how well work is matched to technicians and sequenced through the day, judged through proxy measures such as schedule adherence, windshield time and backlog age rather than one formula.

Glossary4 measuresRelated: 7 links
01

The proxy measures.

There is no single dispatch efficiency formula. These three measures, read together, show whether dispatch choices are working.

  • Schedule adherenceWhether visits arrived on time and finished in their slot, see schedule adherence.
  • Windshield timePaid driving as a share of paid hours, see windshield time.
  • Backlog ageHow long open work waits, see work order backlog.
  • Worked exampleA no-cooling call comes in at 1:00. Tech A has the right certification and is finishing a job 12 km away; Tech B is free now but 35 km away. Sending A adds about 20 minutes of driving instead of about 50, and still arrives inside the window: windshield time falls and schedule adherence holds.
02

How to read dispatch efficiency.

How to measure dispatch efficiency

There is no single formula. Read three measures together: schedule adherence for whether the plan held, windshield time for how much driving it took, and backlog age for how long work waited. A change that improves one at the cost of another, such as cutting drive time by leaving urgent work waiting, is not an improvement.

Why dispatch efficiency matters for commercial contractors

Across several branches with contractual response windows, dispatch decides whether a promise is realistic before the day starts. Poor choices tend to show up as extra driving, missed windows and a backlog that grows even when technician capacity looks sufficient.

What limits dispatch efficiency

Dispatching from a whiteboard, spreadsheet or calendar with no skills, certifications or locations attached makes it hard to see the trade-offs. Separate calendars per branch make it harder still to balance work between locations.

How Thermal supports dispatch

Thermal's dispatch board shows jobs and sites on a map beside each technician's schedule, and can suggest a technician ranked by required certifications, skills, open capacity, agreement value and distance from the sites they are already working that day or their home base, with jobs close to an SLA breach moved up; a dispatcher reviews and applies each suggestion. Ranking by the technician's live position is on the roadmap.

03

Questions about this term.

How is dispatch efficiency different from schedule adherence?

Schedule adherence is one outcome: did visits arrive and finish on time. Dispatch efficiency is the quality of the choices behind it, judged across adherence, driving and backlog.

Does Thermal use the technician's live location?

Not for suggestions today. Thermal measures distance from the sites a technician is already working that day or their home base. Ranking by live position is on the roadmap.

Does a suggestion replace the dispatcher?

No. Thermal suggests; a dispatcher reviews and applies the assignment.

05

These numbers, on your own book.

If you want to see them calculated from real work orders and agreements rather than a spreadsheet, that's a demo.