Wrench time

Wrench time is the percentage of a technician's paid hours spent working hands-on on equipment, as opposed to driving, waiting or doing paperwork: hands-on-the-job hours divided by total paid hours.

Glossary6 inputsRelated: 7 links
01

The formula.

Hands-on-the-job hours over total paid hours, for the same period.

  • Hands-on-the-job hoursTime spent working on the equipment. The on-site visit clock is measured, but it also holds paperwork, waiting for access and waiting for parts; take those out by logging them or by sampling, and label the result as estimated.
  • Total paid hoursAll paid hours for the same period, from timesheets, including travel, warehouse time and admin.
  • Worked exampleA technician is paid 9 hours. The on-site visit clock shows 6 hours, of which about 1 hour was waiting for access and writing up. Wrench time = 5 ÷ 9 = 56% (estimated, because the 1 hour is an estimate).
  • Decision it informsWhich non-repair time to attack first: driving, waiting on site, or admin.
  • Read withTechnician utilization (billable hours over available hours) and windshield time (drive time between stops).
  • ExcludedTravel, loading up at the warehouse and admin between jobs: paid time, so in the denominator, never the numerator.
02

How to read wrench time.

How to calculate wrench time

Wrench time equals hands-on-the-job hours divided by total paid hours for the same period. Paid hours come from timesheets. Hands-on hours are harder: the on-site visit clock is measured, but it includes write-ups, waiting for access and waiting for parts, so the hands-on share inside it is usually estimated by logging those interruptions or by sampling days. Say which parts are measured and which are estimated whenever you report the number.

What lowers wrench time

The usual drags are drive time between stops, waiting on site for access or for a part that was not staged, and paperwork such as notes, photos and signatures. Capturing paperwork on a phone during the job can shorten it, but it does not remove it, and how much time it saves varies by company. Measure the split for a few weeks before deciding which drag to work on.

Why wrench time matters for commercial contractors

Labor is usually the largest cost line for a commercial or mechanical service contractor, and wrench time shows how much paid labor turns into work on equipment. Across 10 to 200 technicians, a few points of wrench time is a meaningful amount of capacity, which tends to appear first as backlog growth or missed windows.

How Thermal supports wrench time

Thermal does not report a wrench time figure. Its time reconciliation report puts each visit's on-site clock, from work starting to completion, beside the payroll time entries, billable labor and invoiced labor for the same job and technician, which are the measured inputs; a visit can be flagged as waiting on parts or access, but those waits are not timed.

03

Questions about this term.

How is wrench time different from technician utilization?

Wrench time is hands-on hours over paid hours. Technician utilization is billable hours over available hours, which can include billable diagnosis and other chargeable work that is not hands-on repair.

What's a good wrench time target?

There is no universal number; it depends on route density, job mix and how much admin is still manual. Track it against your own baseline.

Does travel time count toward wrench time?

No. Travel is paid time, so it sits in the denominator, never the numerator.

Is the on-site clock the same as wrench time?

No. The on-site clock also holds paperwork and waiting. It is an upper limit for hands-on time, not the hands-on time itself.

05

These numbers, on your own book.

If you want to see them calculated from real work orders and agreements rather than a spreadsheet, that's a demo.