Technician utilization

Technician utilization is the share of a technician's available hours spent on billable customer work: billable hours divided by available hours for the same period.

Glossary5 inputsRelated: 8 links
01

The inputs.

Hours of chargeable work over the hours the technician was scheduled to be available, for one technician and one period.

  • Billable hoursHours on chargeable customer work: time-and-materials jobs, agreement-covered visits and billable diagnosis. Travel is not billable hours, even when a trip charge is billed; nor are training, warehouse time or callbacks you do not charge for.
  • Available hoursThe hours the technician was scheduled to work, from their working hours, less approved time off. Overtime worked is added to available hours when it is paid.
  • Worked exampleOne day: 8 available hours. 1.5 hours driving (a trip charge was billed on one call), 5 hours on billable jobs, 0.5 hours at the supply house, 1 hour in a safety meeting. Utilization = 5 ÷ 8 = 62.5%.
  • Decision it informsWhether a technician, crew or branch has room for more work, and whether a gap is a demand problem or a scheduling one.
  • Read withWindshield time, where travel is measured, including billed travel.
02

How to read technician utilization.

How to calculate technician utilization

Technician utilization equals billable hours divided by available hours. Available hours are the hours the technician was scheduled to work, less approved time off, plus paid overtime. Billable hours are chargeable customer work, including agreement-covered visits and billable diagnosis. Travel is left out of billable hours even when a trip charge is billed; it is measured as windshield time. Pick these rules once and use them for every technician and branch.

Why technician utilization matters for commercial contractors

Utilization links headcount to recovered labor cost. It helps an operations or branch manager tell whether the company needs to hire, has more people than current demand, or has a scheduling gap. Comparing branches side by side, with the same rules, shows which ones are under-booked or over-committed for their crew size.

Utilization vs wrench time

Utilization is billable hours over available hours; wrench time is hands-on hours over paid hours. A technician can be highly utilized while wrench time is lower if billable time includes diagnosis, waiting on site or paperwork charged to the job. Read the two together.

How Thermal tracks technician utilization

Thermal's tech utilization report divides approved, clocked-out time entries for regular and overtime work by each person's capacity from their working hours, and never counts travel or non-chargeable entries as billable, so it depends on technicians clocking time and managers approving it. Technician scorecards show a separate scheduling-load figure: scheduled appointment time against an eight-hour weekday.

03

Questions about this term.

Does billed travel count as billable hours?

Not in this glossary. A trip charge recovers the cost of driving, but the hours are measured as windshield time, not utilization.

Paid hours or available hours?

This glossary uses available hours: the hours the technician was scheduled to work, less approved time off, plus paid overtime. Whichever you choose, use it for every technician.

How does utilization tie into payroll?

It uses the same hours but is not a payroll calculation. Payroll still runs in your payroll or accounting system, and Thermal feeds the operational hours data to it.

Does agreement-covered PM work count as billable?

Yes. It is billed through the agreement even when the customer gets no line-item invoice for the visit.

What's a good technician utilization target?

It varies by trade, route density and job mix. Treat published targets as general guidance and track your own trend.

05

These numbers, on your own book.

If you want to see them calculated from real work orders and agreements rather than a spreadsheet, that's a demo.